Saturday, April 13, 2013

Flooring has begun...

Finally, after weeks of waiting for the tile guy, we now have some flooring started.  Hopefully the cabinet guy will begin installing cabinets next week, and then the tile guy will finish.

Kitchen and dining area, with brick pavers.  They take old, salvaged bricks, and slice them into thin sections, to be laid as pavers.




Same brick pavers, in the master bathroom.




We also have the top section of exterior front stairs.  From the landing up to the house are permanent, but from the landing down is temporary, until we get the yard filled and graded.  The lower section of stairs will not be in front like the temp section.  There will be two lower sections, one going left and one going right.