Wednesday, August 22, 2012

Boat house is almost finished

The boat house and dock are almost finished.  AJ still needs to do some sanding and finishing of the surfaces to remove splinters and rough edges, and he needs to hang the boat lift, which was delivered yesterday.  He will also run water and electric to the dock, and hang some lights and stuff.

This is looking at the boat house from the road.  The high roof is for teh big boat, the lower section covers the main deck and the small slip.


The view looking across the small slip and deck toward the big slip, ( AJ's barge on the left side):


View of the big slip, ( AJ's barge and pushboat on far side):



1 comment: